SERVICES INCLUDE
|
Tile & Adhesive Removal
On floors, a specific jack hammering technique is used, which lifts a good portion of the adhesive with the tiles.
We then use an adhesive plainer connected directly to a dust extractor eliminating as much dust as possible whilst grinding away all existing glue. |
Screeding FloorsNot only do we screed wet area floors creating falls towards waste pipes,we can also level-screed any dips/slops in existing surfaces before tiling.
|
|
|
Replacing Wall Sheets
Extra framing is added before hanging either Villaboard lining or Aquachek sheets, ensuring minimal movement, reducing the chance of grout, silicone or even waterproof failure.
|
Subfloor RepairsWe can remove and replace any existing compromised floor joists before laying either Particle Board or Sycron flooring.
|
|
|
Tile UnderlayWe lay ceramic tile underlay sheeting on any particle, ply or timber surfaces before tiling, greatly reducing the risk of tiles cracking/lifting caused by the movement that naturally occurs in all
three substructures. |
WaterproofingWe apply waterproofing membrane over the top of screed beds instead
of under, in-turn eliminating the risk of moisture penetrating the screed which can compromise the tiles adhesion and/or create a smelly bathroom due to stagnate water pooling within the screed bed itself. |
|